MERAM RENEWABLE ENERGY

Toros Meram Renewable Energy and Organic Fertilizer Complex was built on 100,000 m2 of land within the boundaries of Meram District of Konya Province, Turkey. The below units are fully integrated within the complex:

• Biogas Plant

• Dry Organic and Organomineral Fertilizer Plant

• Liquid Organic and Organomineral Fertilizer Plant

Biogas Plant:

• Electricity generation capacity: 6 MW

• Capacity utilization factor: 95%

• Number of reactors: 5

• Number of gas engines: 4

• Working principle: Thermophilic

• Desulphurization unit: Bacteriological

• Working period: 7 days / 24 hours

Raw materials (inputs):

• Poultry waste

• Cattle waste

• Hay

• Caustic dairy factory wastes

• Slaughterhouse waste

• Other organic industrial wastes

 

Dry Organic and Organomineral Fertilizer Plant:

Raw materials (inputs):

• Biogas digestate - solid phase

• Hot air heated with biogas engines exhaust gas

• Hot water from biogas engines jacket cooling

 Products (outputs):

• Dry, pelleted, granulated & powder, hygienic, stabilized organic fertilizer

• Dry, pelleted, granulated & powder, hygienic, stabilized organomineral fertilizer

 

Liquid Organic and Organomineral Fertilizer Plant:

Raw materials (inputs):

• Biogas digestate – liquid phase

• Hot air heated with biogas engines exhaust gas

• Hot water from biogas engines jacket cooling

Products (outputs):

• Hygienic, stabilized, organic liquid fertilizer at a rate of 30-40% dry matter

• Hygienic, stabilized, organomineral liquid fertilizers